Title of the operation : Lighting of the enclosure, the ground and the surroundings of the new stadium of Oran
Owner : DLEP of the Wilaya of Oran
Project manager : Atelier Tom Sheehan et partenaires (ATSP) (leader) - L'Agencelumière
Method of execution : Public contract
Cost of the operation : 125M € HT
Amount of lighting work: €4.2 million excluding tax
Completion date: 2021
The Oran Olympic complex includes a large 40,000-seat stadium and all the facilities needed to host an Olympic event: a nautical center, training stadiums, hotels, an Olympic village, etc. Soon to be a candidate for future Olympic Games, Algeria is demonstrating through this investment its ability to host national and international sporting and cultural events.
Within the framework of the project, L'Agencelumière was responsible for the lighting of all the stadium's spaces, from the lighting design of all the interior spaces (reception, VIP, tertiary, technical, etc.), to the night-time treatment of the surroundings and entrances. A special study was carried out on the integration of the sports projectors within the architectural structure.
Beyond the functional function of the lighting, the lighting allows the roof to be enveloped, making it physical and recognizable from afar, and to animate the public spaces that surround the stadium.